Freshly poured concrete pad with Constructive Landscaping trailer

SERVICE AREAS / KODAK

Concrete Pads for RVs, Trailers & Equipment in Kodak, TN

Constructive Landscaping pours concrete pads for RVs, trailers, parking and equipment for homes in Kodak, TN (37764) and across Sevier County.

  • Free on-site estimate and a written price
  • Sized and reinforced for what will sit on it
  • 55+ five-star Google reviews
  • About 53 minutes from our Oak Ridge base

Free Estimate in Kodak

Starting priceFree written estimateExact number after a free walkthrough
The ground hereDewey soilWell drained, about 10% slope
PermitsSevier County Building InspectionsWe confirm permits at the estimate
Nearby waterDouglas LakeAbout 5 miles from town; TVA rules apply on the shoreline

The ground in Kodak

Why Kodak pads need a real base

USDA soil survey maps show the land within about a kilometer of Kodak's center is mostly Dewey silt loam, 6 to 15 percent slopes, eroded (about 20% of the area) and Steadman silt loam, 0 to 3 percent slopes, occasionally flooded (about 13% of the area). The Dewey soil there is well drained, with a typical slope around 10%.

The USDA rates the Dewey soil near Kodak for slab foundations, like a concrete pad:

Not limitedSomewhat limitedVery limited
  • Clay that swells when wet and shrinks when dry
  • Steep slopes

That's why we pour pads on a compacted gravel base, sized and reinforced for what will sit on them.

For a concrete pad, the USDA also lists:

  • Dewey soil: rated somewhat limited for slab foundations because of clay that swells when wet and shrinks when dry and steep slopes, with moderate shrink-swell.
  • Steadman soil: rated very limited for slab foundations because of occasional flooding and a seasonal high water table, with low shrink-swell.
  • Talbott soil: rated very limited for slab foundations because of steep slopes and clay that swells when wet and shrinks when dry, with moderate shrink-swell.

Source: USDA NRCS Web Soil Survey. This describes the area around the town center, not your lot. We check your yard at the free estimate.

How we do it

5 steps, done right

  1. Free on-site visit

  2. Dig, grade and base

  3. Forms and rebar

  4. Pour and finish

  5. Let it cure

Every step in detail on our Concrete Pads for RVs, Trailers & Equipment page

Screeding a fresh concrete driveway pour

What's included

Poured once and poured right

  • Pads for RVs and trailers
  • Parking pads
  • Equipment pads
  • Sized and reinforced for what sits on them

We'll give you an exact number after a walkthrough of your project.

Call or Text 865-385-4216
★★★★★
Chayim is a great young man, he is knowledgeable and driven which is so refreshing! He came out and walked us through the project we had in mind and gave us a stellar price on sloping the yard away from the house. Would highly recommend him for your next project.
Connor Buis, Google review

Recent Concrete Pads Around East Tennessee

See more photos in the gallery

Permits in Kodak

In unincorporated Sevier County, permits go through Sevier County Building Inspections. Inside city or town limits, that city's codes office may handle it instead. We confirm what your project needs during the estimate.

Building near Douglas Lake

Douglas Lake is about 5 miles from Kodak's center. Section 26a of the TVA Act requires a TVA permit before any construction on the shoreline of a TVA lake.

Concrete Pads in Kodak: Questions

What is the soil like in Kodak?

The USDA soil survey maps the area around Kodak's center mostly as Dewey silt loam, 6 to 15 percent slopes, eroded, which is well drained. Soil changes from yard to yard, so we look at yours during the free on-site estimate.

Is the ground in Kodak good for a concrete pad?

The USDA soil survey lists the Dewey soil around Kodak as rated somewhat limited for slab foundations because of clay that swells when wet and shrinks when dry and steep slopes. That's why we pour pads on a compacted gravel base, sized and reinforced for what will sit on them.

How long before I can use a new pad?

It takes one week to be useable and one month to fully cure. We'll give you a clear date when we finish the pour.

Do you work in Kodak?

Yes. Kodak (37764) is in our service area. Kodak is about 53 minutes (40 miles) by road from our base at 100 Warehouse Rd. in Oak Ridge, without traffic.

Get a Free On-Site Estimate

Fully insured. Call or text 865-385-4216. We'll look at your project and give you a solution.

Call or Text 865-385-4216

Concrete Pads Near Kodak

More in Kodak